No more 'gaming the system'

Beyond flood recovery, Globe City Council discusses water service disconnection agreement, demolition of Rogue Building

Posted

After a comprehensive update on recovery and mitigation from the September 2025 flood during Globe City Council's Jan. 14 meeting,  attention was turned to other issues, such as dog waste stations, demolition of the Rogue Building next to the library, and the signing a water service disconnection agreement with Arizona Water  Company, which allows for improved sewer billing accuracy and enforcement action on sewer accounts that are delinquent by 90 days or more, preventing people from 'gaming the system.' 

Kismet Foundation to donate downtown dog waste stations

Kismet Foundation board member Sarah Alexander appeared before the council to request approval for installing donated dog waste stations on city property in downtown Globe, and she took the opportunity to present an overview of the foundation’s recent work.

The foundation’s 2025 activities included food bank donations, the Kismet Kids youth program at Hollis Cinema, fire safety education funding, the Furry Friends Festival for pet adoptions, and $24,000 in direct support to local businesses affected by flooding.

Alexander also highlighted the recent opening of Kismet Kloset, an upscale resale shop designed to generate ongoing revenue for the foundation while providing a part-time paid position.

Looking ahead to 2026, she outlined continued work across four focus areas — community rejuvenation, underserved populations, education, and animal welfare. In 2026, the foundation expects to run programs including:

  • the return of Kismet Kids movie program
  • a renamed community run event, now called the Kismet Krawl
  • a partnership with the Humane Society on Dogtoberfest
  • a new women-focused business program launching in partnership with Freeport-McMoRan

Alexander emphasized that the dog waste station project aligns with the foundation’s community rejuvenation goals and responds to long-standing concerns about cleanliness and walkability downtown. 

Seven of the stations will be located on Broad Street — one at Yuma Street, one near the Hanging Tree, one in front of Kino Floors & Interiors, one at Mesquite Street, one at Cedar Street, one near the water station at the library, and one at Sycamore Street — pending approval of local businesses. The eighth station will be located at Globe City Park (the Train Park).

Sundt Construction will donate labor, materials, and tools to install the stations. The Kismet Foundation will manage logistics, sponsorships, and ongoing maintenance, with all supply costs covered by the foundation.

City signs water service disconnection agreement with Arizona Water Company

Travis Ashbaugh, Globe’s Assistant Public Works Planning Director, explained the recently approved water service disconnection agreement between the City of Globe and Arizona Water Company. The agreement allows the city and Arizona Water to share water consumption data, which will improve sewer billing accuracy and also enable enforcement action on sewer accounts that are delinquent by 90 days or more.

For shared customers — those who receive water service from Arizona Water but sewer service from the city — the agreement will allow the city to request water shutoff if a customer has unpaid sewer bills and hasn’t made arrangements for a payment plan.

Ashbaugh said currently, there are 19 sewer accounts that are 90 days or more delinquent, totaling $43,435.25.

City Manager Paul Jepson emphasized that if residents have problems paying their utility bills, they should communicate with the city, and staff will work with them to arrange a payment plan. Jepson said those who do this will not be affected by the new disconnection agreement.

Council also discussed the possibility of using other enforcement tools in the future, such as property liens.

Ashbaugh emphasized that all customers in Arizona Water districts will receive a notice about the new agreement, but in reality, only the “shared” customers will be subject to the agreement’s enforcement provisions. There are only about 250 shared customers, and they are mostly located in the western part of the city.

The agreement will take effect Feb. 1.

Emmanuel Garcia recognized for five years of service

Globe Fire Chief Gary Robinson recognized firefighter/EMT Emmanual Garcia for five years of service with the City of Globe. Chief Robinson highlighted Garcia’s prior experience with Tri-City Fire District and the mining industry, his leadership in the department’s technical rescue program, including rope and swiftwater rescue, and his current role mentoring newer firefighters. Garcia currently serves as interim engineer/driver operator on C shift.

Rogue Building demolition waiting for funding

Public Works Director John Angulo and Jepson provided an update on the status of the Rogue Building, located next to the library. The building is owned by the city, and has long been slated for demolition due to its poor condition. 

The estimated cost of demolition is approximately $90,000, and the city has not yet been able to secure a source of funding. Jepson said that although the building was affected by last year’s floods, it will probably not qualify for DEMA emergency reimbursement because much of the damage had occurred before the floods.

Jepson said remediation work has already been completed to make the site safe.

“The funding has always been an issue, and more so now, so we’re going to keep searching for grants and looking for opportunities.” — Paul Jepson, Globe City Manager

Angulo also outlined several factors that will make demolition complicated. These include managing drainage from an uphill property, stabilizing a retaining wall near a neighboring historic home, and ensuring that demolition does not create new structural or water-management issues for adjacent parcels.

Under property law, the higher-elevation property owner is responsible for controlling runoff, and the city wants to ensure proper long-term solutions are in place rather than creating unintended consequences.

Jepson said the city bought the building years ago with the intention of using the land for parking, although Angulo said at one time the city was considering renovating the building for use.

Jepson said there will be more discussion about the building at the upcoming Strategic Action Plan meeting.

Municipal Property Corporation bylaws approved

Globe Mayor Al Gameros convened a brief meeting of the City of Globe’s Municipal Property Corporation to give its president, Vice Mayor Mike Stapleton, a chance to explain its purpose and why it is being revisited. 

The MPC was established in 2007 as a legal financing tool to support city projects, but has never been actively used. However, as Globe’s infrastructure needs and financial complexity increase, staff are reviewing existing tools to ensure the city is prepared to plan responsibly.

Stapleton explained that before any future use of the corporation, its bylaws need to be updated to clarify roles, authority, and governance. Proposed amendments included changes to board membership qualifications and moving away from having the city’s council members automatically serve as the corporation’s board.

The intent is to ensure transparency, public accountability, and alignment with Council direction, Stapleton said.

Council formally approved the adoption of the amended bylaws of the MPC, which were previously vetted by the City Attorney.

Motions approved

Council also approved motions for the following:

  • Accounts payable in the amount of $741,447.88
  • Ratifying the City of Globe’s letter of support for the appeal of the State of Arizona’s federal disaster declaration request related to the September 2025 flood event.
  • Awarding a contract to PumpMan Phoenix in the amount of $7,858.63 for replacement of the community pool pump and motor. The amount includes contingency for potential freight charges.
  • Ratifying a contract with Convenient Mobile Services LLC in the amount of $9,508.55 for emergency flood debris clearing, loading services, and heavy equipment use following the Sept. 26, 2025 flood event. The services were executed under the city’s emergency declaration, with a portion of costs expected to be reimbursed through state emergency funding, contingent on eligibility.
  • Approving an Arizona Department of Liquor License location transfer for the Safeway store located at 240 South Hill St. The request was not for a brand-new license to begin sales at Safeway, but for an additional license to be associated with the same property. A Safeway representative said the extra license would remain inactive for the time being, and they are asking for it because it will make it easier for the company to expand within Gila County in the future by transferring that secondary license to a new location if needed. Council held a public hearing, but there were no takers.
  • Approving a budget adjustment of $150,000 to meet the required 25% local match for flood-related projects to be funded through Arizona’s Department of Emergency and Military Affairs (DEMA). Globe Finance Manager Dani Beathard explained that this amount is for invoices that have already been paid, for projects included on the 60-day damage assessment list. The funds had already been budgeted and set aside for this purpose.
  • Approving a budget adjustment of $150,000 in anticipation of upcoming flood mitigation work by Civiltec Engineering, to be funded through the Natural Resources Conservation Service. This adjustment reallocates contingency funds to cover required matching costs. Jepson explained that the budgetary aspects of this project are complicated, and moving the money will help keep the process clear. This approval does not authorize immediate spending, only the transfer of the funds.
  • Approving two related contracts with Civiltec Engineering Inc. to support flood mitigation work along Upper Pinal Creek under the federal Emergency Watershed Protection program. The first is in an amount not to exceed $10,000 for Construction Manager at Risk process assistance. The second contract is in an amount not to exceed $1,160,660, for engineering services. For both contracts, it is expected that 75% will be reimbursed through the NRCS EWP program, with possible 100% reimbursement for the technical assistance.

To view this meeting online, click here.

To view documents related to this meeting, click here. 

Full minutes can be found by visiting: https://www.globeaz.gov

Members of the Globe City Council: Mayor Al Gameros, Vice Mayor Mike Stapleton (District 4), and Council members Freddy Rios (District 1), Mike Pastor (District 2), Jesse Leetham (District 3), Mariano Gonzalez (District 5), and Fernando Shipley (District 6).

Comments

No comments on this item Please log in to comment by clicking here